Emethanex - Damietta (EGYPT): October 2007 - July 2008

Collaboration for the supply of structural calculations and checks for the following structures: In addition to the design of the previous steel structures, have been designed the reinforced concrete foundations (plinth on piles). The total weight of steel structures is about 1500ton.